Door head production and installation contract
甲方: (hereinafter referred to as Party A)
乙方:Chongqing Qianjuji Advertising Co., LTD. (hereinafter referred to as Party B)
In accordance with the Advertising Law of the People's Republic of China, Contract Law of the People's Republic of China and relevant national laws and regulations, Party A and Party B shall abide by the principles of equality, voluntoriness, fairness and good faith in relation to Party A"Flower spring aquatic fresh" door head, carb light box, car stickerManufacture and installationAnd photo super card production (not including installation) worksThe following terms and conditions of the contract have been agreed upon through consultation for mutual compliance。
I. Project name and location:
1Project name: Door head, card light box, car sticker production, installation and photo super card production (excluding installation) project
2Installation location: Party A's designated location in Nanan District, Chongqing
Ii. Project Content:
Party B shall manufacture and install the door head, cabbages light box, car stickers and photo super card board (excluding installation) in accordance with the written documents confirmed by both parties. Engineering practices and material selection standards are set out in the appendix hereto。
Iii. Project period:
Term of the Project: After the Contract is signed and takes effect, Party B shall complete all the project contents agreed herein and deliver them to Party A for acceptance within 10 working days。
Iv. Contract Price:
The project of making, installing and making (excluding installation) of door head, cabbages, car stickers and photo super card as agreed herein,The total price including tax is RMB ***** Yuan (in words: ******** whole)。The aforementioned total price includes but is not limited to production costs, labor costs, materials costs, machinery costs, taxes, insurance, transportation, construction slag cleaning and transportation costs, installation costs, scaffolding, finished product protection, safety measures and feesCivilized construction costs and all project-related expenses。
V. Payment method:
1Within 3 days after this Contract is signed, Party APay the total contract price to Party B50%,即****Yuan (in words: RMB Eleven thousand two hundred yuan only);
2The project contents agreed herein have been implemented and passed acceptance by Party AAfter signing the written acceptance document,Party B shall provide Party A with a special VAT invoice equal to the total contract price (tax rate0.1%) upon receipt of the invoice by Party A7Pay to Party B within working days****Yuan (uppercase:******元整);
3、The remaining **** yuan (in words: **** yuan only) shall be used as the project quality guarantee fund. Party A shall pay the remaining amount to Party B without interest within 30 working days after deducting all deductible expenses (in case of insufficient deduction, Party B shall make up the amount within 5 working days upon Party A's notice) upon expiration of the warranty period and Party B has no quality problems。
4、Party B's account information:
Account name: Chongqing Qianjuji Advertising Co., LTD
Opening bank: China Minsheng Bank Co., LTD. Chongqing Nanping Branch
账 号:162354109
6. Supply of materials and equipment:
1Materials and equipment required for the project shall be purchased and supplied by Party B.乙方The materials and equipment purchased and supplied must meet the relevant national or local standards, and must comply with the requirements of the design document;
2Samples of materials and equipment supplied by Party B shall be submitted to Party A before formal construction.It can only be used after Party A confirms the actual product, and the samples submitted shall be shared by both partiesAfter confirmation, it shall be sealed up and used as the acceptance standard。
Vii. Project quality, acceptance standards and warranty period
1Quality requirements: qualified
2Acceptance criteria:The current national, local and industrial relevant construction technology (sequence), construction and acceptance standards, mandatory provisions and other norms and regulations;The current national, local and industrial regulations on construction environmental protection, safety, civilization and other norms and regulations;Existing national and local laws, regulations and regulations on the administration of public security;Advertising structure production and installation should be firm,Wind resistance should reach level 7;Engineering practices and materials selection as set forth in the annex to this contract;
3After all production and installation is completed by Party B,Party B shall notify Party A of acceptance,Party A shall organize the acceptance inspection within 3 days after receiving the notice from Party B,Party A shall inspect and accept the project in accordance with the effect drawings and engineering drawings confirmed by both parties, the acceptance standards agreed herein and the sealed samples,accepted,Both parties shall sign a written document confirming this。If the project fails to pass the acceptance inspection, Party B shall make rectification in accordance with the contract until the project passes the acceptance inspection. If the actual construction period exceeds the agreed period, the part exceeding the agreed period shall be deemed overdue.
4The warranty period of this project is12(b) from the date on which Party A passes the acceptance inspection and signs the written acceptance document。
Viii. Rights and Obligations of both Parties:
(1) Rights and obligations of Party A
1. Party A shall be responsible for the pre-approval of the advertisement installation. If Party A meets the picket of urban management and other supervisory organs during the construction due to incomplete approval procedures, Party A shall be responsible for coordinating until the normal construction period, and the construction period shall be extended accordingly;
2Party B's design plan shall be submitted to Party A for approval, and Party B shall start production after Party A confirms it electronically or in writing;
3When Party B enters the construction site, Party A shall provide Party B with the advertised installation location, and ensure that the location has no pipeline lines and meets the construction requirements. Party A shall designate a power connection point for Party B, and Party B shall extend the installation site by itself;
4Pay the contract amount on time as agreed herein;
5Party A shall be fully liable for any disputes arising from trademarks, portraits, advertising words and the advertising content provided by Party A;
6In case of stoppage, suspension of construction, demolition and other reasons caused by Party A, Party A shall pay corresponding expenses according to the actual construction conditions. During the construction period, Party A shall be obliged to conduct safety supervision over Party B's construction。
7Party A shall make the payment to Party B within the agreed time. If the payment is overdue, Party B shall have the right to dispose of the completed project and pay Party B a penalty equal to 5% of the total contract price for each day overdue。
(II) Rights and obligations of Party B
1Party B shall make and install advertisements within the time limit agreed herein, and shall take care of such advertisements before the project is installed and delivered to Party A for use. In case of any damage, Party B shall repair the advertisements and bear the corresponding expenses;
2Party B shall be responsible for completing the Contract in quality and quantity within the agreed term of the project. If the project is overdue, Party B shall pay Party A a penalty equal to three-thousandth of the total contract price for each day overdue。If Party B delays for more than 5 days, Party B shall pay the total contract price to Party A5%The production and installation period shall be calculated from the date Party A determines the documents;
3Party B shall take appropriate safety measures for Party B's construction personnel to ensure the safety of the project construction. Party B shall be liable for all safety accidents occurring during the construction and shall be liable for compensation.
4. Party B's construction personnel shall comply with the management regulations of Party A and the construction area during the construction period, obey the management and abide by the law。Party B shall be jointly and severally liable for the acts of its construction personnel. If Party A or any third party is harmed by the acts of Party B or its construction personnel, Party B shall bear all the responsibilities.
5Any problems arising during construction shall be settled by both parties through negotiation。If Party B is unable to carry out the construction due to natural disasters such as earthquake or power failure, the construction period shall be postponed accordingly.
6Party B shall ensure that the project quality, structural rigidity, wind resistance and other indicators meet the national standards。If Party B fails to meet the standard, Party B shall bear the responsibility for rework and compensate Party A for the corresponding losses caused thereby.
7Party B warrants that, during the warranty period, in the event of any failure of the project within the scope of this Contract, Party B shall, upon receipt of the repair notice from Party A,24Arrive at the scene of the accident within hours to troubleshoot。Party B shall replace and bear the costs of equipment materials, labor and other relevant expenses if the problem is caused by the quality or production of the parts after inspection. Party B shall indemnify Party A for any loss caused thereby (except for irresistible natural disasters)。If Party B fails to arrive at the site for troubleshooting in accordance with the contract after receiving the repair notice from Party A, Party A shall have the right to entrust a third party to carry out the repair and the corresponding expenses shall be borne by Party B。
Liability for breach of contract
1Any direct or indirect breach of any provision of this Contract by either party shall constitute a breach, and the non-breaching party shall have the right to request the breaching party to correct its breach by giving a written notice. The breaching party shall take measures to eliminate the consequences of breach and compensate the non-breaching party for the losses suffered by the breaching party.
2The losses of the non-breaching party to be compensated by the breaching Party shall include the direct economic losses and additional expenses (including but not limited to legal costs, attorneys' fees, travel expenses, etc.) caused by the non-breaching party due to its breach of contract.。
X. Dispute resolution methods
Any dispute arising from the performance of this Contract shall be settled by both parties through friendly negotiation. If no agreement can be reached through negotiation, either party shall bring a lawsuit to the court where this contract is signed, namely the People's Court of Nanan District of Chongqing for settlement。
11. Supplementary Provisions
1Matters not covered herein shall be settled by both parties through negotiation and confirmed by signing a supplementary agreement separately. The supplementary agreement shall be annexed to the Contract and have the same legal effect as the Contract.
2Party A and Party B confirm that the following communication methods and addresses are the effective delivery methods and addresses for accepting the notice:
甲 方:
Contact address:
Associated person:
Contact number:
Party B: Chongqing Qianjuji Advertising Co., LTD
Address: Nanan District Xiangshui Road auto parts City 16-2
Contact: Zhang Jiancheng
Contact number: 13637925802
If a party sends a notice to the address agreed above, the effect of service shall not be affected if the notice is not delivered or rejected, and the mail shall be deemed to have been delivered on the date of return。If the above contact information is changed, the changing party shall notify the other party in a timely manner; otherwise, it shall be deemed that the change has not been made, and the party failing to notify shall bear adverse legal liabilities。The foregoing agreement on service shall apply to judicial service;
3The design drawings confirmed by Party A shall be attachments to this Contract;
4This contract is made in triplicate, with Party A holding two copies and Party B holding one copy. The contract shall come into force upon being sealed by both parties and each copy shall have the same legal effect.
5、Annex to this contract:
(No text below)
甲方: 乙方:Chongqing Qianjuji advertising Co., LTD
Date of Signing: Date of Signing:
This contract is signed in Nanan District, Chongqing